Estimator · BIM documentation

BIM Documentation Starter

Derive a plan-sheet count exactly from your own area, floors, disciplines, sheet size and scale, then scale it to a whole issued set by one declared, editable ratio. Sections, elevations, schedules and details are excluded.

Free to useNo account neededInputs stay in your tabAssumptions checked September 2026Owner-approved for preliminary use · not independently reviewed

Not independently reviewed. No hours-per-sheet figure in this repository has been measured, and the plans share rests on one counted register per issue rather than on your projects, so every result reports NOT_CALIBRATED and requires professional review before it is used in a fee submission, a contract programme or a resource commitment.

What this tool does

It estimates how many documentation sheets one issue contains. It derives the plan sheets from quantities you hold at bid stage — area, floors, disciplines, sheet size and scale — then scales them to a whole issued set by one declared ratio you can see and change. It can turn that count into production hours at an hours-per-sheet figure you enter, and it stops there. Sheet coverage uses this tool’s standard usable plotting area for the sheet size you pick, so you are never asked for your title-block dimensions.

It is not a fee, a team-size, a resource-planning or a programme tool, and it produces neither a TIDP nor an MIDP. It reports no people, no duration, no capacity and no money.

Two figures, never merged. The plan count is exact arithmetic. The issued set count carries one declared assumption and is labelled ESTIMATED. A count you have made yourself replaces it outright, is labelled ENTERED, and the estimate is set aside beside it rather than blended into it.

Excluded from every result: Sections, Elevations, Schedules, Project-specific details, Standard (library) details. They follow building anatomy rather than area, so this tool scales to a set by one visible ratio instead of asking you to type four guesses.

Start with what you know

Your answers stay in this tab. Nothing is stored, and nothing is sent anywhere. Every blank quantity leaves the figure that depends on it unresolved rather than assumed.

Project

Three quantities you already hold at bid stage. They set the floor plate the sheet has to cover.

The gross floor area of the building. Choose the unit; none is inferred from your browser. For example 12000.

No unit is inferred from your browser.

Used only to divide the area into a floor plate. Whole number, for example 6. For example 6.

After identical floors are documented once. This typicality collapse is the single largest source of error in a sheet count, so it is asked rather than assumed. For example 4.

Documentation

What is drawn, on what sheet, at what scale. Sheet coverage uses this tool’s standard usable plotting area for the sheet size you pick, so you are not asked for your border and title-block dimensions.

Which disciplines are in scope? (required)

Select each discipline once. Under Advanced each one you select gets its own plan-types figure, and that is what separates a warehouse from a hospital of the same area. You are not asked how many disciplines there are: this list is the answer.

Your office standard. It selects the usable plotting area the coverage arithmetic uses, so no title-block dimension is asked for. A usable plotting area is recorded only for A1; on any other size the sheet count is withheld rather than guessed.

At 1:n, a usable sheet W mm wide spans W x n / 1000 metres. Enter n, for example 100. For example 100.

Advanced

One plan-types figure for each discipline you selected above, each starting at the methodology’s minimum of 1. This is the only place this tool holds those figures, and a discipline you have not selected contributes nothing. The optional footprint dimension turns the plan derivation from a minimum into an exact count.

Plan types by discipline

Select the disciplines in scope above and each one will appear here with its own plan-types count.

The longest plan dimension of the building. With it the derivation becomes exact rather than a minimum.

No unit is inferred from your browser.

Issue

The issue you pick prefills the plans share and reads into nothing else. That share is the one assumption in this tool, and it is in one place rather than smeared across four typed fields.

This prefills the plans share and reads into nothing else in the arithmetic. Building type, asset class and complexity read into it nowhere.

The share of a whole issued set that is plans. The number in this box is the number used. Change it and nothing will overwrite it, including a later change of issue. Prefilled from the issue above; editable.

Why this value?

Choose the issue above and this box is prefilled with a starting value that names the register it was counted from. The number in the box is the number used.

If you have counted your own drawing register, enter it here. Your count replaces the estimate outright and is labelled ENTERED; the estimate stays visible beside it, never blended with it.

Optional effort

Optional. No hours-per-sheet figure in this repository has been measured, so the rate is yours and the result says so. Without it both sheet counts still stand on their own.

Origination time for one issued sheet, at the scale and class you issue. State to yourself whether checking is inside it; this tool takes the figure as given. Use a dot for decimals.

Result

No result yet. Complete the project, documentation and issue questions and select Calculate. Figures that cannot be resolved are listed by name, together with the single input that would resolve each one.

How the method works

  1. Sheets per plan is derived exactly: at 1:n, a usable sheet W mm wide spans W x n / 1000 metres, and sheets per plan = max(1, ceil(floor plate / plottable area)) (§3). W and H come from this tool’s standard usable plotting area for the sheet size you choose, which is where §3 carries them.
  2. With the optional longest footprint dimension the derivation becomes exact rather than a minimum, tiling the footprint in both directions.
  3. Plan sheets = floors that need their own drawings x sheets per plan x the plan types you declare, summed across the disciplines in scope: each selected discipline carries its own plan-types figure, so the sum is the disciplines’ own numbers rather than one figure multiplied by how many of them there are (§3, and §3.1 and §6.1 of v0.1). Those figures live under Advanced, one per selected discipline, each starting at the methodology’s minimum of 1 (§5). A discipline you have not selected has no figure and contributes nothing.
  4. Issued set sheets = plan sheets divided by the plans share, rounded up to a whole sheet. That share is the one declared assumption in this tool, and it is named on the result with the register it was counted from (§3, §4).
  5. A count you have made yourself replaces the estimate outright and is labelled ENTERED. The estimate stays visible beside it and is never blended with it (§6).
  6. Hours = issued set sheets x your hours per sheet. That is where this tool stops: it reports no people, no duration, no capacity and no fee (§3).
  7. Anything you have not supplied stays unresolved. It never becomes zero, and the components you have supplied stay visible and separately labelled (§8).

The plans share, and where it comes from

No measured modern benchmark exists. The US National CAD Standard gives a sheet-type taxonomy with no quantity attached, and Scher’s 1972 survey of a school and a hospital is the only measured sheet-type breakdown located. Three public drawing registers were therefore counted sheet by sheet. Each is one project, so these are samples rather than a benchmark, and the finding that matters is the gradient: the plans share falls as the issue advances.

If columns extend beyond the screen, swipe this table sideways or focus it and use the left/right arrow keys.

The starting value each issue prefills, and the register it was counted from.
Issue being estimatedPrefillCounted from
Planning or statutory submission35%Counted from one 2026 hospital planning register: 31 plans in 97 sheets, with no details or schedules in the set.
Tender or construction issue25%Counted from one school bid set: 13 plans in 53 architectural sheets.
Full production set, all disciplines15%Scher 1972, a survey of a school and a hospital: plans were 13 to 16% of the architects drawings.

Declared industry practice, not measured on your projects. Count your own drawing register and replace it.

Three rules hold here without exception: the prefill is visible and editable and the number in the box is the number calculated; a value you have typed is never overwritten, including by a later change of issue; and nothing about building type, asset class or complexity reads into it. Drawing indexes from five or more of your own completed projects would turn this into a figure naming your own practice. Below five records it stays an anecdote.

Limitations, and when this tool refuses

  • This is a defensible planning estimate built from your own declared quantities and one cited ratio. It is not a prediction.
  • Until hours per sheet is recorded from a completed package, this tool is a sheet counter with an effort calculator attached. The plan count is arithmetically sound; the set count carries one declared assumption; the effort figure is only as good as the rate typed into it.
  • A usable plotting area is recorded for A1 only. On any other sheet size the sheet count is withheld rather than approximated from the nominal sheet, because a border and a title block are not a fixed proportion of a sheet.
  • The plans share rests on one counted register per stage. Five of your own drawing indexes per stage would turn it into a source naming your practice, with sample size and transferability limits. Below five records it stays an anecdote.
  • Linear infrastructure is documented by chainage, not by tiling a footprint, so the plan derivation does not describe it. Refurbishment excludes survey, record-drawing reuse and demolition plans. Under design and build, confirm whose portion of the set this counts.
  • Not a fee, not a resource-loaded programme, and not an ISO 19650 conforming information delivery plan. It produces neither a TIDP nor an MIDP.
  • The methodology record is version 0.4.0, approved by its owner on 22 September 2026 for preliminary guidance and early-stage estimation, and for nothing beyond that. That is the owner’s own sign-off, not an independent review: no independent professional review of this methodology has taken place, and approval measured nothing. Review by an appropriate professional is still required before this is relied on for detailed planning, a contractual commitment or a final documentation requirement.
  • No discipline in scope and no issue declared each refuse outright. A refusal names the missing basis. It is not an error and it never means zero.
  • No hours-per-sheet rate leaves the hours unresolved. Both sheet counts are still reported, and this is the most common useful state of this tool.
  • No plans share leaves the issued set count unresolved. The plan count is unaffected, because the share reaches only the step from plans to a set.
  • A sheet size with no recorded usable plotting area withholds the sheet count and names what is missing. Only A1 carries one, from the methodology’s own declared 631 × 574 mm; the nominal sheet size is never substituted for it.
  • A request for a cost, a fee, a headcount, a programme, a sheets-per-1,000 m² rule of thumb or a plans share keyed to building type is refused rather than approximated.

For a cost or a fee, carry the sheet count by hand to cost, fee or rate, headcount or team composition. No value passes automatically between these tools, and the sheet size and scale must match the rate you price it at.

Methodology documentation-sheet-effort-v1, version 0.4.0, status OWNER_APPROVED. Owner Hossam Farag, who approved it on 2026-09-22 for preliminary guidance and early-stage estimation, and for nothing beyond that. That is the owner’s own sign-off and not an independent review: reviewers, none. It is not a validation, a calibration or a certification, and professional review is still required before detailed planning or a contractual commitment. Substantively modified 2026-09-21. The full evidence register, the source classifications and the professional-review trigger table are recorded in the methodology document rather than reproduced here.